top of page

Industrial Demolition & Asbestos Removal Northampton

Services

Structural Demolition, Asbestos Removal & Enabling Works, Site Clearance, Waste Segregation & Recovery

Location

628 North Portway Close, Northampton Northamptonshire

Client

TBC

Start & Completion

September – October 2026

Project Overview

Hawkes Group was appointed by [Client Name] to undertake the industrial demolition and asbestos-related enabling works at 628 North Portway Close, Northampton.

​

 

Located within an established commercial and industrial area, the site comprised extensive steel-framed buildings.

​

 

The demolition formed part of [insert confirmed development proposals or intended future use of the site], with the removal of the existing building superstructures required to facilitate the next stage of the project.

​

 

Hawkes Group secured the project through a competitive tender process, with its combination of proven demolition experience, specialist technical expertise and a competitive commercial proposal demonstrating strong value for the client.

​

 

Working within an established commercial setting, the project required a coordinated approach to asbestos management, structural demolition and material handling, with careful consideration given to neighbouring occupiers and the site boundaries.

Project Summary

Hawkes Group delivered an integrated industrial demolition and enabling works package, coordinating the preparatory activities with the controlled removal of the existing structures.

The scope encompassed:

01

Site Establishment & Preparation

The initial phase involved establishing the working arrangements required to deliver the demolition programme. Site activities were planned around the existing boundaries and neighbouring premises, with appropriate work-area segregation and temporary access arrangements incorporated into the sequence of operations.

​

Coordination of these activities established the framework for the asbestos-related works and subsequent structural demolition.

03

Temporary Access Arrangement

Scaffolding and associated access arrangements supported the asbestos-removal sequence, providing the necessary access for the planned enabling activities.

​

The temporary arrangements were coordinated with the wider programme to support the transition from asbestos removal to mechanical demolition.

05

Waste Segregation & Material Recovery

Demolition arisings were brought to ground level for sorting and removal. Scrap metal, hardcore and residual demolition waste were handled separately to support appropriate material recovery and disposal.

 

The segregation process was coordinated with the demolition sequence to maintain an organised working area and facilitate the removal of materials as the structures were dismantled.

02

Asbestos Removal & Hazardous Materials Management

Asbestos management formed a critical part of the pre-demolition programme. Survey findings informed the separation of the specialist notifiable asbestos-removal package from the non-licensed works undertaken by Hawkes.

​

A specialist asbestos contractor carried out the notifiable removal works, including the necessary access arrangements and clearance documentation.

 

Hawkes-trained operatives undertook the non-licensed works using task-specific controls, segregation and authorised waste disposal arrangements.

 

The relevant removal and clearance stages were coordinated before structural demolition proceeded in affected areas.

04

Controlled Structual Demolition

Following completion of the relevant asbestos works and clearance stages, Hawkes progressed with the mechanical demolition of the industrial buildings.

 

Steel framing, roof structures and cladding were progressively reduced using specialist demolition excavators and purpose-selected attachments. The demolition sequence was planned to manage machine movements, exclusion zones, falling materials and interfaces with adjacent areas.

 

The main superstructures were demolished to the top of the existing concrete floor slabs, in accordance with the defined scope of works.

06

Specialist Plant & Equipment

Hawkes deployed its LiuGong 933F straight-boom demolition excavator, alongside Hyundai excavators and specialist demolition attachments.

​

Experienced operators progressively dismantled the steel-framed structures, managing the removal of structural elements and the handling of demolition arisings within the available working footprint.

​

The deployment of specialist plant and experienced personnel supported the controlled execution of the demolition programme.

Project Challenges and Delivery Considerations

​

The principal demolition works substantially cleared the industrial building superstructures and loose demolition arisings, leaving the existing concrete slab areas visible. The removal of the main structures and segregation of demolition materials established the next stage of the site works. The raised concrete platform was designated for a separate breakout and crushing operation after the clearance of scrap materials, which was completed in October 2026. This preparation made the site ready for the planned redevelopment to begin.

​

Project Outcome

 

Hawkes Group completed the demolition works in October 2026 as scheduled. The principal demolition works substantially cleared the industrial building superstructures and loose demolition arisings, leaving the existing concrete slab areas visible.

​

The raised concrete platform was designated for a separate breakout and crushing operation, which was managed shortly afterwards.

​

Through the coordinated delivery of asbestos removal, structural demolition, material segregation and concrete crushing, Hawkes Group completed the enabling works required to take the site from its former industrial use to a prepared site ready for redevelopment.

Project Gallery